Afipsky refinery.
In April 2015 on Afipsky oil refinery were carried out works of the movement of the vacuum column K-601 (weight 256 tons, diameter 9360 mm, length 35775 mm) above the acting overpass of technological pipelines.
Novocherkassk
In May 2013 on Novocherkassk power plant were carried out works of lifting and installation of the generator stator weighing 320 tons to a height of 11 meters.
YEAR 2013
Nizhnevartovsk
Difficult rigging operation of lifting HRSG drums to a height of 35 meters indoors was performed by specialists of JSC «Titran" in January-February 2013 in Nizhnevartovsk. The task was complicated by the cramped conditions of work and absence of auxiliary cranes. The basic part of ...
YEAR 2012
Nizhnevartovsk
We have fulfilled the installation of a gas turbine General Electric weighing 290 tons and generator weighing 218 tons by the hydraulic rigging system SBL1100 capacity of 1100 tons. To install the turbine on the support it was lifted to a height of 6 meters and was moved above the ...
The gas turbine power station of Novy Urengoy Gas-Chemical Complex.
JSC "Titran" carried out works for transportation from the warehouse of temporary storage to the installation site and the installation on foundations of two gas turbine generators (weight of 79 tons each), a steam turbine generator (weight of 78 ...
Introduced to the work Hydraulic Lifting system
500-ton lifting capacity lifting height up to 18 meters
Installation on the Foundation 2 SIEMENS generators weighing 320 tons
size 13000х4064х4159. Kirishi