In 2020,  Titran JSC specialists completed a set of works at the Yerevan CHPP in the Republic of Armenia. The following types of equipment were reloaded from railway transporters and installed in the design position:

  • Step-up transformer. Weight 182 tons;
  • Gas turbine. Weight 221.4 tons;
  • Gas turbine generator. Weight 129 tons;
  • Steam turbine generator. Weight 129 tons;
  • Capacitor. Weight 80 tons.