Rigging works, installation and dismantling of heavy equipment   In modern conditions the construction of industrial projects ,whether new power block of electric station, the new shop of engineering plant where is necessary to locate an oversized, heavy weight equipment (turbines, generators, presses, ...

READ MORE +

April 2016

April 2016

St. Petersburg. On the Baltic Shipyard were carried out lifting and installation of two tanks of metal-water protection on the largest nuclear-powered icebreaker "Arktika". Height of lifting is 18 meters, weight of each tank is 250 tons. .

READ MORE +

April 2015

April 2015

  Afipsky refinery. In April 2015 on Afipsky oil refinery were  carried out works of the movement of the vacuum column K-601 (weight 256 tons, diameter 9360 mm, length 35775 mm) above the acting overpass of technological pipelines.

READ MORE +

May 2013

May 2013

Novocherkassk In May 2013 on Novocherkassk power plant were carried out works of lifting and installation of the generator stator weighing 320 tons to a height of 11 meters.  

READ MORE +

January-February 2013

January-February 2013

YEAR 2013 Nizhnevartovsk Difficult rigging operation of lifting HRSG drums to a height of 35 meters indoors  was performed by specialists of JSC «Titran" in January-February 2013 in Nizhnevartovsk. The task was complicated by the cramped conditions of work and absence of auxiliary cranes. The basic part of ...

READ MORE +

September 2012

September 2012

YEAR 2012 Nizhnevartovsk We have fulfilled the installation of a gas turbine General Electric weighing 290 tons and generator weighing 218 tons by the hydraulic rigging system SBL1100 capacity of 1100 tons. To install the turbine on the support it was lifted to a height of 6 meters and was moved above the ...

READ MORE +

December 2011 – February 2012

December 2011 – February 2012

The gas turbine power station of Novy Urengoy Gas-Chemical Complex. JSC "Titran" carried out works for transportation from the warehouse of temporary storage  to the installation site and the installation on foundations of two gas turbine generators (weight of 79 tons each), a steam turbine generator (weight of 78 ...

READ MORE +

2011

2011

Liski Unloading of heavy seats up to 150 tonnes from the barge to the pier carried out by rigging crane-independent method

READ MORE +

June 2010.

June 2010.

Introduced to the work Hydraulic Lifting system 500-ton lifting capacity lifting height up to 18 meters Installation on the Foundation 2 SIEMENS generators weighing 320 tons size 13000х4064х4159.  Kirishi