Category: Our projects

January 2021

January 2021

January 2021 Ekibastuz, Republic of Kazakhstan Mobilization of equipment and personnel during the New Year holidays, amid the limitations of the Covid-19 pandemic. Unloading from vehicles, moving to the workshop and installation in the design position of 4 wheel machining centers weighing 40 tons each.

READ MORE +

August – October 2021

August – October 2021

Moscow CHPP-27 - a branch of PJSC "Mosenergo" Works on dismantling and installation of the generator stator with a mass of 175 tons in the cramped conditions of the operating turbine hall No. 2 of CHPP-27 were carried out without dismantling pipelines and service platforms up to the level of +6,000. Above the ...

READ MORE +

September – October 2021

September – October 2021

Magnitogorsk. Lifting, moving with the rigging method and setting in the projected position of two scrubbers of the air cleaning system of a blast furnace steel-making furnace weighing 60 tons and standing at a height of 30 m.

READ MORE +

June – July 2021

June – July 2021

June 2021 Admiralty Shipyards Saint Petersburg - dismantling of the turning-boring machine model 1580 L with rigging equipment in the cramped conditions of the old workshop.

READ MORE +

June – November 2020

June – November 2020

In 2020,  Titran JSC specialists completed a set of works at the Yerevan CHPP in the Republic of Armenia. The following types of equipment were reloaded from railway transporters and installed in the design position: Step-up transformer. Weight 182 tons; Gas turbine. Weight 221.4 tons; Gas turbine ...

READ MORE +

June – August 2020

June – August 2020

Amursk 2020 - together with "Spetsstroymash" LLC Unloading and installation of an autoclave of 1000 tons with a hydraulic lifting system SBL 1100 were carried out at the facility "Amur Hydrometallurgical Plant".

READ MORE +

May 2020 – March 2021

May 2020 – March 2021

Kemerovo. During the pandemic from May 2020 to March 2021, we installed the technological pipelines at the "SDS AZOT" facility. The work was carried out with pipes and fittings made of stainless steel. The followin titles were mounted: "Water circulation cycle", "Ammonia pumping station", "Stand".

READ MORE +

December 2019

December 2019

JSC "Titran" performed rigging, overturning (tilting by 180 °) and installing the base of a vacuum chamber weighing over 100 tons in the design position at one of the enterprises of Roskosmos in Krasnoyarsk krai. The base diameter of the chamber exceeded 14 meters.

READ MORE +

November 2019

November 2019

Nizhnekamsk The unique work of rigging a generator weighing in at 250 tons and a turbine weighing in at 110 tons was carried out by our specialists in Nizhnekamsk. The peculiarity of this project is that the load was lifted to a height of over 7 meters and moved 50 meters without support on the foundations. That ...

READ MORE +

2018 – 2019

2018 – 2019

Zapolyarny In 2018-2019 JSC "Titran" performed works on the installation of a lean concentrate enrichment shop at the facility - the enrichment plant. Concentrate offloading unit at the site of the Kola MMC Enrichment Plant, Zapolyarny. More than 60 pieces of equipment were installed, including: The body ...

READ MORE +