January 2021
Ekibastuz, Republic of Kazakhstan
Mobilization of equipment and personnel during the New Year holidays, amid the limitations of the Covid-19 pandemic. Unloading from vehicles, moving to the workshop and installation in the design position of 4 wheel machining centers weighing 40 tons each.
Moscow CHPP-27 - a branch of PJSC "Mosenergo"
Works on dismantling and installation of the generator stator with a mass of 175 tons in the cramped conditions of the operating turbine hall No. 2 of CHPP-27 were carried out without dismantling pipelines and service platforms up to the level of +6,000. Above the ...
Magnitogorsk.
Lifting, moving with the rigging method and setting in the projected position of two scrubbers of the air cleaning system of a blast furnace steel-making furnace weighing 60 tons and standing at a height of 30 m.
June 2021 Admiralty Shipyards Saint Petersburg
- dismantling of the turning-boring machine model 1580 L with rigging equipment in the cramped conditions of the old workshop.
In 2020, Titran JSC specialists completed a set of works at the Yerevan CHPP in the Republic of Armenia. The following types of equipment were reloaded from railway transporters and installed in the design position:
Step-up transformer. Weight 182 tons;
Gas turbine. Weight 221.4 tons;
Gas turbine ...
Amursk 2020 - together with "Spetsstroymash" LLC
Unloading and installation of an autoclave of 1000 tons with a hydraulic lifting system SBL 1100 were carried out at the facility "Amur Hydrometallurgical Plant".
Kemerovo. During the pandemic from May 2020 to March 2021, we installed the technological pipelines at the "SDS AZOT" facility. The work was carried out with pipes and fittings made of stainless steel.
The followin titles were mounted: "Water circulation cycle", "Ammonia pumping station", "Stand".
JSC "Titran" performed rigging, overturning (tilting by 180 °) and installing the base of a vacuum chamber weighing over 100 tons in the design position at one of the enterprises of Roskosmos in Krasnoyarsk krai. The base diameter of the chamber exceeded 14 meters.
Nizhnekamsk
The unique work of rigging a generator weighing in at 250 tons and a turbine weighing in at 110 tons was carried out by our specialists in Nizhnekamsk. The peculiarity of this project is that the load was lifted to a height of over 7 meters and moved 50 meters without support on the foundations. That ...
Zapolyarny
In 2018-2019 JSC "Titran" performed works on the installation of a lean concentrate enrichment shop at the facility - the enrichment plant. Concentrate offloading unit at the site of the Kola MMC Enrichment Plant, Zapolyarny.
More than 60 pieces of equipment were installed, including:
The body ...